Operations Index
Deployment, system docs, and ops for the Cowork ecosystem. The meta-project that publishes and maintains every other project.
publish.sh deploy.
Live
The repeatable 6-phase checklist for wiring a new sub-project into the system — folder, CLAUDE.md, palette, index.html, master-dash entry, verify. ~15 min.
Top-level hub linking all 13 Cowork projects — live outputs, in-flight builds, archived work. Recent activity rail, freshness dots, per-project action register.
Six-phase deployment playbook: sign up, wrangler install, deploy, Zero Trust Access. ~20 min.
Preview of the daily Hermes brief — calendar, action items, weather, portfolio. Sample from 14 April.
Design-system preview of the Longevity Command Centre, used to validate the new layout and component system.
System
Design Tools
Palette exploration: Deep Neutral with dark header and ink-based typography system.
Palette exploration: Dark Warm Earth with terracotta accents and warm neutral surfaces.
Palette exploration: Warm Neutral with cooler undertones — informed the current Charcoal baseline.
Pending HTML migration
VPS-based Telegram agent setup, architecture, model choices, MCP tooling. Currently a 42 KB Markdown file — needs HTML migration.